Enerplus - Virden Routledge 16-17 Battery Upgrades

left 1

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for modification at Enerplus’ Virden Routledge oil battery to fix an oxidized flare stack and reduce site emissions. Project scope included:

  • Removal of existing Flare Stack and associated piping
  • Installation of 40’ Dual HP / LP Flare Stack and associated piping
  • Tie-in low pressure tank vents into flare
  • Installation of a blanket gas system for existing tanks

"Decades of Expertise Driving Innovative Engineering Solutions"

Building Smarter Energy Infrastructure

To engineer reliable, forward-thinking energy solutions with safety, sustainability, and client value at the core of everything we do.